Water

At DuBois Consultants, water is our specialty. With over 20 years of focused experience in the water market, we bring deep civil and structural enginering expertise and proven value to every project. As a leader in the study, design, and construction of water infrastructure and facilities, we offer a full range of specialized services, including program management, design, site development, new construction, concrete rehabilitation, structural evaluations, special inspections, construction administration, resident engineering, and more. Our extensive experience allows us to deliver tailored solutions that address the unique needs and challenges of each project site.

Capabilities

Water Distribution

Water + Wastewater

Treatment Plants

Storm Sewers

Sanitary Sewers

Stormwater

Management

Hydraulic Modeling

Specialty Studies +

Peer Review

Owner’s Advisory

Construction Phase

Services

Water Project Gallery

Wichita Water Facility

The City of Wichita, KS, replaced the aging 80-year-old Main Water Treatment Facility with the new Wichita Water Facility. This new 120 MGD, state-of-the-art, and future-proof facility will impact up to 55,000 families and homes across the city and surrounding areas. Our scope of services on the project included the design of six clarifier tanks, influent meter vault, influent splitter structure, influent flow control vault, ancillary bridge and support structure, solids contact clarifier, liquid holding tank, and multiple Pre-Engineering Metal Buildings (PEMBs) foundations on site. We also provided structural peer reviews of the chlorine contact basin and construction administration support.


Location: Wichita, KS

Owner: City of Wichita, KS

Role: Subconsultant

Completion: 2025

Project Duration: 6 years

Discipline: Structural Water

40th & Monroe Sewer Separation

KC Water is working to separate approximately 220 acres of the City’s combined sewer system and eliminate select outfalls and/or diversion structures. During design, DuBois Consultants provided civil engineering services including utility coordination, sanitary and storm sewer design, and water main relocation. Our team designed a total of 5,020 LF of the water main replacement which aimed to replace break-prone and obsolete water mains that conflicted with the proposed storm sewer system. Currently, we are providing construction phase engineering services. Our lead civil inspector is on site daily to observe the construction process.


Location: Kansas City, MO

Owner: KC Water Services

Role: Subconsultant

Completion: Design (2023), Construction (Ongoing)

Project Duration: 4+ years

Discipline: Civil Water

Inflow/Infiltration Reduction: Northern Basin

The City of Kansas City required a comprehensive review of CCTV and manhole inspection data, smoke testing results, and field investigations to assess the sanitary sewer collection system. The project aimed to identify and quantify structural deficiencies, then develop rehabilitation recommendations and construction documents to reduce basement backups and inflow/infiltration (I/I) within the system. DuBois Consultants calculated I/I for manholes, pipes, and service laterals. These calculations informed a repair schedule for approximately 14,000 LF of sewer lines. The civil team also provided construction observation services to ensure all repairs and main replacements complied with Smart Sewer guidelines.


Location: Kansas City, MO

Owner: KC Water Services

Role: Prime Consultant

Completion: 2024

Project Duration: 2 years

Discipline: Civil Water

Todd Creek Wastewater Treatment Plant Facility Plan

The existing Todd Creek Wastewater Treatment Facility is being upgraded to treat 8.7 MGD to meet projected demands in the year 2050. The influent pump station, splitter, and grit removal systems are being upgraded to meet current MDNR standards, and a SCADA system is included in the facility plan. DuBois Consultants is providing civil and structural engineering and design services that encompass all site grading, stormwater, and water infrastructure. Our civil team developed the Erosion and Stormwater Pollution Prevention Plans, and our structural team designed the influent pumping station vault, effluent meter, and aeration structures. Upon completion of the final design, the project was relocated to a new site. DuBois Consultants is currently working on the redesign process of the facility plan to tailor it to the new location.


Location: Kansas City, MO

Owner: KC Water Services

Role: Subconsultant

Completion: Ongoing

Project Duration: 5 years

Discipline: Civil/Structural Water

Owner’s Advisor for Wichita BNR Program

The City of Wichita, Kansas, operates five wastewater treatment facilities known as Plants 1 through 5. Plants 1, 2, and 5 are connected to one another and are the focus of the biological nutrient removal (BNR) improvements. DuBois Consultants’ scope of service was specific to conducting quality assurance/quality control (QAQC) reviews at milestone submittal stages within the project design schedule. Specific tasks included: review of civil engineering design drawing, specifications, and cost estimates; QAQC reviews of civil site plans/details, dimensional plans, grading plans, erosion control plans, utility plans, and detail sheets; QAQC reviews specific to physical tie-ins for incoming interceptors, force mains, and outfalls, discharges to sanitary sewer, stormwater, and roadway access.


Location: Wichita, KS

Owner: City of Wichita, KS

Role: Subconsultant

Completion: 2023

Project Duration: 6 months

Discipline: Civil Water

Water Main Replacement: Scarritt to Crystal Ave.

This project was a part of the KCMO Water Services Department’s large water main replacement projects in fiscal year 2022 and consisted of replacing break-prone or out-of-date water mains and providing other distribution system improvements in the area of Scarritt Ave. to Crystal Ave, E. 18th St. to Denver Ave. DuBois Consultants provided the prime firm with Envision support, the erosion and sedimentation report, registration numbers, and the Stormwater Pollution Prevention Plan (SWPPP).


Location: Kansas City, MO

Owner: KC Water Services

Role: Subconsultant

Completion: 2024

Project Duration: 10 months

Discipline: Civil Water

Blue River Bio-Solids Facility

The Blue River Wastewater Treatment Plant was upgraded and renamed the Blue River Bio-Solids Facility, which now features the Thermal Hydrolysis Process (THP), a first for the Midwest, to recycle human and domestic waste. DuBois Consultants provided structural engineering and design services on the THP and gas flare foundations, east and west holding tanks, electrical building foundation design, digester building renovation, several site equipment foundation pads, pipe supports, and more. In addition, our team provided construction administration services during the construction phase. With the conclusion of this project, our team has begun work on the Blue River Grit Removal & Fine Screens project at the same site.


Location: Kansas City, MO

Owner: KC Water Services

Role: Subconsultant

Completion: 2024

Project Duration: 4 years

Discipline: Structural Water

Smart Sewer Program

Kansas City’s Smart Sewer Program (SSP) is a long-term initiative to modernize the city’s aging sewer infrastructure, reduce overflows, and improve water quality. The program includes neighborhood and annual sewer rehabilitation, green infrastructure for stormwater management, and overflow control systems to protect residents and waterways. DuBois Consultants has been involved in the SSP since 2011, and we have an in-house hydraulic modeling Subject Matter Expert (SME) who models sewer and stormwater systems across Kansas City. Over the past decade, our team has provided hydrologic and hydraulic (H&H) model updates, network builds, calibration, analysis, and more on a large variety of projects across Kansas City.


Location: Kansas City, MO

Owner: KC Water Services

Role: Subconsultant

Completion: Ongoing

Project Duration: 11+ years

Discipline: Civil Water

Wichita Plant 2 BNR Improvements

The City of Wichita, KS, operates five wastewater treatment facilities referred to as Plants 1, 2, 3, 4, and 5. Beginning in 2021, the City sought to make significant biological nutrient removal (BNR) improvements at Plant 2. DuBois Consultants was tasked with significant structural assessments, evaluations, and repairs at the plant, including modifying previously designed foundations, pipe support routes and their foundations, new pipe support locations, and checking the capacity of the existing thickening building and tunnel. Additionally, we performed a structural assessment of the clarifier and basin walls for concrete repairs, as well as the Plant’s air lock tunnel, boiler room, digesters, and sludge holding tanks. Currently, we are in the construction phase of the project, where we continue to support with timely responses to shop drawings, RFIs, and site visits to perform inspections.


Location: Wichita, KS

Owner: City of Wichita, KS

Role: Subconsultant

Completion: Ongoing

Project Duration: 4 years

Discipline: Structural Water

Fishing River Wastewater Treatment Plant Expansion

In 2011, the Fishing River Wastewater Treatment Plant in Kansas City, MO was expanded. The previous plant was a 1.0 MGD extended aeration, factory prefabricated treatment plant. The DuBois Consultants civil and structural design teams’ scope on the WWTP expansion to 2.0 MGD included site development, utility design, stormwater detention and retention, grading, drainage, an access road, and the structural design of the grit building influent pumping station, ultraviolet treatment building, and Blower Building. We also provided the design of several underground structures, such as the influent pumping station valve vault, ultraviolet channel, aeration basin, aeration basin splitter box, final clarifier splitter box, effluent, lagoon and biofilter.


Location: Kansas City, MO

Owner: KC Water

Role: Subconsultant

Completion: 2011

Project Duration: 4 years

Discipline: Civil/Structural Water

Dry Weather Sewer Relief: Outfall 055

KC Water Services set out to reduce the combined sewer overflow within the Lower Blue River Basin by implementing a new Outfall 055 relief sewer. DuBois Consultants served as the Engineer-of-Record and worked on the project from design through construction phases. Our civil engineering scope consists of conceptual design alternatives evaluation, preliminary and final design, and on-site Resident Project Representative presence during the construction phase.


Location: Kansas City, MO

Owner: KC Water Services

Role: Prime Consultant

Completion: 2025

Project Duration: 4.5 years

Discipline: Civil Water

Modernization Improvements at KC Water Treatment Plant

The City of Kansas City, MO, is working to modernize its water treatment plant by addressing rehabilitation needs, optimizing the treatment process, increasing the treatment capacity from 240 to 270 MGD, and eventually allowing for expansion to 300 MGD. DuBois Consultants completed work on Phase I of the project, and is now onto Phase II. Our services include review of previous studies, condition assessment,

structural evaluation, summary of recommended improvements, preparation of full design plans, and construction phase services.


Location: Kansas City, MO

Owner: KC Water Services

Role: Subconsultant

Completion: 2023 (Phase I), Ongoing (Phase II)

Project Duration: 6+ years

Discipline: Structural Water

Water Main Replacement: E. 50th Ter. to Swope Pkwy.

This project was a part of the KCMO Water Services Department’s SLBE water main replacement projects in fiscal year 2022 and consisted of replacing break-prone or out-of-date water mains and providing other distribution system improvements in the area of E. 50th Ter. to Swope Pkwy, E. 55th St. to The Paseo. DuBois Consultants’ civil design team scope for the water main replacement included project administration, preliminary field and record investigations, property surveys, pipeline route surveys, preliminary and final design, and preparation of construction drawings for bidding. The design included 9,952 LF of 6- and 8-inch water mains.


Location: Kansas City, MO

Owner: KC Water Services

Role: Prime Consultant

Completion: 2025

Project Duration: 2.5 years

Discipline: Civil Water

OK Creek: In-Line Additional Storage Facilities

As part of the Federal Consent Decree, the City of Kansas City seeks to construct two separate in-line bending weir storage facilities within the OK Creek Interceptor (OKCI) upstream of the existing OK Creek in-line gate structure. The intent of these additional storage facilities is to maximize storage of wet weather flows and reduce the combined sewer overflows (CSOs) within the Turkey Creek Basin. Currently, DuBois Consultants is producing the structural design of the two in-line gates in the OK Creek sewer. We are supporting the prime consultant through project’s final design and bid phases.


Location: Kansas City, MO

Owner: KC Water Services

Role: Subconsultant

Completion: Ongoing

Project Duration: 1 year

Discipline: Structural Water

Birmingham Wastewater Treatment Plant Improvements

KC Water Services sought to improve the Birmingham Wastewater Treatment Plant (WWTP). DuBois Consultants provided structural engineering and design services on the project including new influent screens design, improvements to the grit facility, new blower buildings (foundation, walls, roof), new internal wall for aeration tank and aerobic digester, pipe supports, and equipment pads. Our engineers also provided modifications to the previous headworks design, structural upgrades of the primary pump station, structural feasibility study, and more. In addition, we provided support during the construction phase of the project.


Location: Kansas City, MO

Owner: KC Water Services

Role: Subconsultant

Completion: Ongoing

Project Duration: Ongoing

Discipline: Structural Water